TL;DR
- The core rule across every flashing type: nail flashing to the roof deck, never to the vertical wall — otherwise seasonal expansion and contraction warps the metal and breaks the seal
- Step flashing at roof-to-wall intersections has to be woven course-by-course with your shingles, not run as one continuous piece
- Kickout flashing at the bottom of a wall-to-roof seam is the most commonly skipped piece — and the one responsible for the most expensive siding and sheathing rot we see on NJ homes
- Chimney flashing needs two parts: base/apron flashing nailed to the roof, plus counter flashing cut into the masonry
- Pipe boot flashing sits on top of the lower shingles and tucks under the upper shingles — the flange is layered into the course, not perched on top of it
- Metal roof flashing uses an entirely different method — closures, butyl tape, and panel-specific trim rather than woven step flashing
- Flashing failure is the most common cause of roof leaks in NJ, which is why Golden Hammer Roofing & Chimney recommends professional installation on anything above living space
How to Install Roof Flashing
To install roof flashing properly, you weave thin metal pieces into your roofing system layer-by-layer so water always flows down and off the roof — never into the seam between your roof and a wall, chimney, or vent. The exact method depends on which area you’re flashing, but two universal rules apply to every type:
- Nail the horizontal flange to the roof deck. Never nail the vertical flange to the wall. Nailing to both ties your roof and wall together, and the independent movement between them through NJ’s temperature cycles warps the metal and breaks the seal within a few seasons.
- Flashing goes under the shingle course above it and over the shingle course below it. Every piece gets layered into the roofing system — never laid on top like a cap.
Those two rules are the entire logic of flashing. Every method below is a variation of them applied to a specific area of your roof.
After 25+ years replacing roofs across all 21 NJ counties, we can tell you that flashing failure is one of the most common cause of roof leaks we see — more than storm damage, more than shingle failure, more than ice dams. And in almost every case, the failure traces back to one of those two rules being broken during the original install.
What You’ll Need: Tools and Materials
Materials:
- Step flashing pieces, pre-bent L-shape, sized to your shingle exposure (sizing details below)
- Kickout flashing piece
- Counter flashing or apron flashing for chimney and front-wall applications
- Pipe boot flashing sized to match your vent pipe diameter
- Ice and water shield that runs a minimum of 5″ up the vertical wall and across the deck
- Synthetic underlayment
- Architectural shingles plus a starter course
- Galvanized roofing nails, 1¼” minimum
- Asphalt plastic cement conforming to ASTM D4586
- Masonry caulking for chimney counter flashing
Tools:
- Hammer or roofing nailer
- Tin snips
- Utility knife with hook blade
- Chalk line
- Pry bar
- Angle grinder with a masonry blade (chimney counter flashing only)
- Caulk gun
- Hand seamer or lead dresser for chimney work
- Safety harness with a roof anchor — not optional on any pitched roof
The Four Types of Roof Flashing (and Where Each Goes)
Four flashing types cover almost every situation on a typical NJ residential roof:
| Flashing Type | Where It Goes | Method |
| Step Flashing | Roof meets a vertical wall — dormer, second-story wall, side of a chimney | L-shaped pieces woven course-by-course with shingles |
| Kickout Flashing | The very bottom corner where a wall meets the eave | Diverts water from the siding into the gutter |
| Chimney Flashing (Base + Counter) | Where a chimney passes through the roof | Two-part system — base nailed to roof, counter cut into masonry |
| Pipe Boot Flashing | Plumbing vents and soil stacks | Rubber-and-metal flange layered into the shingle course |
A complete roof-to-wall seam almost always needs step flashing and kickout flashing together. Chimneys need base flashing on the low side, step flashing up the sides, counter flashing on all faces, and a cricket on the high side if the chimney is wide. Vent pipes need their own boot. If any one of these is missing or installed wrong, you’ve built in a leak.
How to Install Step Flashing on a Roof
Step flashing is used wherever a sloped roof meets a vertical sidewall — dormers, second-story walls, the sides of a chimney. The Asphalt Roofing Manufacturers Association’s Residential Manual spells out the method as the industry standard, and every certified installer in NJ works to the same specifications.
Step 1: Lay Ice and Water Shield Up the Wall First

Before any shingles go on, run your ice and water shield across the roof deck and at least 5 inches up the vertical wall. This creates a waterproof base layer that catches anything the flashing eventually misses. In NJ, where ice dams back water up under shingles during winter storms, this backup layer is what saves your interior when the primary flashing ages out 20 years from now.
Step 2: Size Your Flashing Pieces Correctly
Step flashing pieces should be a minimum of 10 inches long and at least 2 inches wider than your shingle exposure. The sizing that pairs with each shingle type:
| Shingle Type | Shingle Exposure | Flashing Size |
| Standard 3-tab or architectural | 5″ | 10″ x 7″ |
| Standard laminated | 5⅝” | 10″ x 8″ |
| Wide-format laminated | 9½” (non-exposed area) | 10½” x 10″ or two overlapping standard pieces |
| Premium designer (Crowne Slate, etc.) | 10″ | 10″ x 12″ |
The 10-inch length gets bent at 90 degrees — 5 inches extending onto the roof deck, 5 inches up the wall.
Step 3: Install the First Piece Over the Starter Course
Install your starter strip and first course of shingles up to the wall. Place your first piece of step flashing over the end of the starter course so it sits flush against the wall, with the horizontal flange flat on the roof deck.
Step 4: Nail to the Deck — Never to the Wall
Secure the horizontal flange with two galvanized roofing nails placed within 1 inch of the upper edge of the flashing. The reason the ARMA manual is so direct about this: differential movement between the wall and the roof causes shingle buckling and sealant breakage when flashing is nailed into both. Your roof moves. Your wall moves differently. Pin them together and something has to give — usually the water seal.
Apply a 3-inch-wide bead of asphalt plastic cement under the flashing before you set it down. This locks the piece in place and backs up the mechanical nailing.
Step 5: Weave Each Course Up the Wall
Lay the next row of shingles completely over the horizontal flap of the first flashing piece. Then place the next piece of step flashing over that new shingle course, positioned so the next shingle row covers it completely. Each flashing piece overlaps the one below by at least 2 inches.
Repeat this staggered pattern — shingle, flashing, shingle, flashing — all the way to the top of the wall intersection.
Step 6: Reset the Siding Over the Vertical Flange
Siding should come down over the vertical flange of the step flashing by at least 2 inches to serve as counter flashing. If the siding was already in place when you started, it needs to be carefully lifted and reset over the new flashing — caulking the flashing to the siding is a shortcut that fails in one NJ winter.
This is one of the hidden complications of a flashing retrofit: the job isn’t really just a roofing job. It’s a roofing job plus a siding job, and both halves have to be done right or the whole seam leaks. Golden Hammer Roofing & Chimney handles both services under one roof — see our siding installation and repair service.
A Note on Reusing Existing Step Flashing
If you’re reroofing over existing step flashing, reuse it only if it’s in like-new condition — not buckled, rusted, bent, cracked, or broken. In practice, that condition almost never applies to flashing that’s been on a NJ roof for 15+ years. New flashing is cheap. A leaking seam from reused flashing is not.
How to Install Kickout Flashing on an Existing Roof
Kickout flashing goes at the very bottom corner where a wall-to-roof seam meets the gutter line. Its one job: deflect water out of the wall-roof corner and into the gutter instead of letting it run down behind your siding.
This is the most commonly skipped piece on NJ homes. Walk around any neighborhood built before 2005 and you’ll see the same pattern: rotted siding right under the wall-roof corner, dark staining running down the wall below it, sometimes a bulge or a crack in the exterior finish. All of it caused by a $15 piece of metal that was left off the original install.
On an existing roof, the retrofit sequence is:
- Carefully lift the lowest shingle and the lowest piece of step flashing at the corner. Use a flat pry bar and work slowly to avoid cracking the shingles above.
- Position the kickout flashing at the exact point where the wall meets the eave. The angled flange sits over the top of the first step flashing piece, with the kicked-out portion extending into the gutter.
- Nail the horizontal flange to the roof deck — same rule as step flashing, two nails near the top edge, never into the wall.
- Reseat the lifted shingle and step flashing over the kickout’s horizontal flange, bedding each piece in a 3-inch bead of asphalt plastic cement.
- Check the drop angle. Water hitting the kickout should visibly deflect sideways into the gutter. If it’s running straight down the wall, the angle is off and the install needs adjusting.
Factory-made kickout flashing pieces are available at any roofing supply house in NJ and work better than hand-bent ones for retrofits. If a contractor tells you kickout flashing can’t be added without a full tear-off, get a second opinion — on most existing roofs, it can be retrofitted into the bottom course without disturbing anything else.
How to Install Roof Flashing Around a Chimney
Chimney flashing is the most technical flashing job on a residential roof. It’s also where we see the most expensive failures. A chimney flashing leak doesn’t just damage the ceiling below — it damages the chimney structure itself, the surrounding sheathing, the attic insulation, and often the second-floor finishes. The repair bill on a chimney flashing failure caught late routinely runs $6,000 to $15,000 by the time the masonry, roofing, and interior work are all done.
That’s why we tell NJ homeowners straight up: chimney flashing is the one job on this page where attempting it yourself usually costs more than hiring it out. The method requires masonry cutting, two-part metal work, and lead dressing — three skills that take years to execute cleanly on a sloped roof.
A proper chimney flashing uses two separate flashing systems working together: base/apron flashing attached to the roof, and counter flashing cut into the masonry. The two layers overlap so masonry movement doesn’t tear the roof-side flashing.
Step 1: Install the Base Flashing (Front Apron)

On the downhill side of the chimney (the side facing the eaves), install a continuous piece of apron flashing. It should extend at least 4 inches up the chimney face and at least 4 inches onto the shingle course below. Bed it in asphalt roof cement and nail the roof-side flange to the deck — not into the chimney.
Step 2: Weave Step Flashing Up the Sides
Install step flashing up both sides of the chimney using the same woven pattern as a sidewall install: one piece per shingle course, each piece nailed to the roof deck only.
Step 3: Install the Back Pan or Cricket

Water running down the roof toward the uphill side of your chimney needs somewhere to go. On chimneys 24 inches wide or less, a back pan works. On chimneys wider than 30 inches, the International Residential Code requires a cricket — a small peaked structure behind the chimney that splits the water flow around both sides. Skipping the cricket on a wide chimney is both a code violation and a guaranteed leak.
Step 4: Cut a Chase Into the Masonry
Use an angle grinder with a masonry blade to cut a horizontal groove — called a “chase” or “reglet” — into the mortar joint about 1 to 1.5 inches deep, roughly 6 inches above the roofline. This groove is where your counter flashing anchors.
Step 5: Insert and Lock the Counter Flashing
Bend your counter flashing so the top lip hooks into the chase. The rest of the piece hangs straight down, overlapping the base flashing below by at least 2 to 3 inches. Secure it inside the groove with rolled lead wedges every 8 to 12 inches, then fill the entire groove with masonry-grade sealant to make it watertight.
Done correctly, the counter flashing slides freely over the base flashing — which is what lets the chimney and roof move independently without tearing anything open.
When Chimney Flashing Reveals Masonry Problems
On older chimneys in Bergen County, Hudson County, and Essex County, cutting a chase into deteriorated mortar often reveals bigger problems: cracked crown, failing mortar joints that extend well below the roofline, or spalling brick that won’t hold a counter flashing seal. In those cases, the flashing job turns into a flashing + masonry repair job — and skipping the masonry side means the new flashing fails within a few seasons.
If your chimney needs this kind of combined work, chimney mortar repair in New Jersey is one of the services we handle alongside the flashing side of the job. We’re also running $40 off chimney cleaning right now, which pairs well with a flashing inspection since the inside of the chimney needs to be clear before the exterior work goes on.
How to Install Pipe Boot Flashing (Vent Pipes)
Plumbing vents poking through the roof deck are small penetrations with an outsized leak risk. A dedicated pipe boot handles them.
Step 1: Shingle Up to the Pipe
Lay your shingle courses bottom to peak until the course reaches the base of the pipe. Cut a tight arc into the top of that shingle so it sits snugly against the lower half of the pipe. Set the cut shingle in asphalt roof cement.
Step 2: Lay Down an Ice and Water Shield Patch
Slide a small square of ice and water shield over the pipe first to seal the deck-to-pipe seam. This is your backup layer if the boot ever cracks or the sealant fails — and in NJ’s UV exposure and freeze-thaw climate, rubber boots do eventually crack.
Step 3: Apply Sealant and Slide the Boot On
Apply a generous bead of flashing sealant around the base of the pipe. Push the boot flange firmly down over the pipe until the flat metal sits flush against the roof deck.
Step 4: Layer the Flange Into the Shingle Course
The bottom half of the flange sits on top of the lower shingles. The top and side flanges sit underneath the next rows of shingles. The boot is woven into the shingle course, not perched on top of it. This is the detail that separates a 20-year install from a 2-year leak.
Step 5: Secure With Hidden Fasteners
Nail the lower exposed flange with washer-head screws or roofing nails placed at least 2 inches away from the pipe to prevent water channels forming around the pipe itself. The upper fasteners get covered by the shingle courses above.
Step 6: Cut the Upper Shingles Tightly
Cut each upper shingle tightly around the rubber cone and bed it in asphalt plastic cement where it overlaps the flange. Daub a small amount of cement over any exposed nail heads.
Pipe boots have a shelf life. The rubber collar typically fails before the metal flange does, and in NJ’s climate you should expect to replace the boot (not necessarily the whole flashing) every 10 to 15 years.
How to Install Flashing on a Metal Roof
Metal roof flashing uses an entirely different method than shingle roof flashing. There’s no weaving involved — instead, you’re sealing panel-to-wall and panel-to-penetration joints with trim pieces, butyl tape, and screws with EPDM washers.
The Key Differences From Shingle Flashing
| Element | Shingle Roof | Metal Roof |
| Flashing method | Woven into courses | Trim pieces sealed to panels |
| Fasteners | Roofing nails | Screws with EPDM washers |
| Sealant | Asphalt plastic cement | Butyl tape + metal roof sealant |
| Expansion handling | Overlap between pieces | Oversized screw holes + sliding clips |
| Pipe penetrations | Rubber-and-metal boot | High-temperature silicone boot |
The Core Install Sequence
Install the panel first, then flash around it — the opposite of shingle sequencing. Apply butyl tape along every panel-to-flashing seam before setting the flashing piece: butyl is the primary seal, the screws are mechanical reinforcement. Fasten through oversized holes with EPDM-washered screws, snug but not over-tightened (a crushed washer leaks within a few seasons). Use high-temperature silicone pipe boots instead of the rubber boots used on shingle roofs — metal roof surface temperatures regularly exceed 180°F in summer, which degrades standard rubber quickly.
Metal roof flashing is also panel-manufacturer-specific. Trim pieces, closure strips, and screws that work on one panel system often don’t work on another, which is why metal flashing installation almost always requires the same brand of trim as your panels. At Golden Hammer Roofing & Chimney, we manufacture our own metal roofing panels in-house, which lets us control the flashing trim end-to-end on every metal roof install.
The Most Common Flashing Mistakes on NJ Roofs
After 25+ years tearing off failed roofs across New Jersey, we see the same handful of flashing mistakes over and over. If your roof has any of these, you’re on borrowed time:
- One long continuous piece of flashing used instead of woven step flashing. One of the most common error we see. A continuous piece looks neat but it can’t handle differential movement — it buckles, pulls away from the wall, and funnels water behind the siding.
- Flashing nailed to both the wall and the roof. Guarantees seal failure within 2 to 5 NJ winters.
- No kickout flashing at the bottom of a wall-to-roof seam. The rotted siding and sheathing we tear off underneath this spot is almost always worse than the homeowner expected.
- Caulk used as the primary seal instead of properly layered flashing. Caulk is a last-resort backup, not a flashing method. It cracks, shrinks, and fails on NJ’s temperature cycle within 3 to 5 years.
- Reusing old flashing on a reroof. Step flashing should only be reused if it’s in like-new condition — not buckled, rusted, bent, cracked, or broken. In practice, that condition almost never applies on a NJ reroof.
- Flashing installed over existing shingles instead of woven into them. This is a related problem to the layer-count issue we covered in our guide to how many layers of shingles can your roof have. A nail-over roof’s flashing is almost always wrong because the installer tried to flash around existing shingles instead of starting fresh.
- Counter flashing surface-mounted to brick instead of chased into the mortar. Surface-mounted counter flashing peels away from the chimney within a few seasons. The chase cut is tedious but structural.
More than half of the leaks we respond to in NJ trace back to one of these seven mistakes. If you’ve got an active leak around a wall, chimney, or vent, call Golden Hammer Roofing & Chimney for roof leak repair in New Jersey — the faster it’s caught, the cheaper the fix.
Should You Install Roof Flashing Yourself or Hire a NJ Contractor?
This is the honest answer most roofing content avoids giving.
Installing flashing yourself can make sense on:
- A shed, detached garage, or outbuilding where a leak won’t damage interior living space
- A simple pipe boot replacement where the surrounding shingles are in good shape
- A low-slope porch roof you can safely access from a ladder
- A roof you’re planning to replace within the next year or two anyway
It almost never makes sense on:
- Your primary roof above living space
- Any chimney flashing job (two-part systems, masonry cutting, lead work)
- Any flashing above a finished attic, bedroom, or kitchen
- Steep pitches above 6/12 where fall risk is serious
- Second-story walls or dormers where access is complicated
- Any job that voids your shingle manufacturer warranty — most warranties require certified-contractor installation on anything beyond basic maintenance
The honest math: a professional flashing job on an existing NJ roof typically costs $400 to $1,500 depending on scope. A failed self-install typically costs $3,000 to $12,000 in interior damage, mold remediation, and re-roofing by the time it’s discovered. The upside of a successful self-install is a few hundred dollars saved. The downside is five figures of damage. That’s not a trade most homeowners should take on a primary roof.
Frequently Asked Questions
Can I install or replace roof flashing myself?
On a shed, detached garage, or a single pipe boot replacement where the surrounding shingles are in good shape — yes, this guide gives you what you need. On your primary roof, chimneys, or anywhere above living space — no. You’d need to lift and reset multiple shingle courses without cracking them, size and bend each flashing piece correctly, and reweave the pattern on a sloped surface. For step flashing or chimney flashing on your main roof, hire a contractor. The downside of a failed install (interior water damage, mold, deck rot) typically costs 10 to 20 times what the professional install would have cost.
What do roofers use to seal flashing?
Asphalt plastic cement conforming to ASTM D4586 is the standard sealant for asphalt shingle roof flashing. For chimney counter flashing, exterior-grade masonry caulking goes into the chase cut. For metal roofs, butyl tape is the primary sealant combined with metal roof sealant at joint seams.
Does flashing go under or over shingles and underlayment?
Flashing sits in the middle of the roofing sandwich — on top of the underlayment, and woven into the shingle courses. The underlayment (ice and water shield or synthetic underlayment) is the base waterproof layer that goes down first. Flashing lays on top of it. Then each piece of flashing is woven into the shingle courses — the lower half of each flashing piece sits on top of the shingle below it, and the upper half tucks under the shingle course above it. That weaving pattern is what makes the whole system work.
What are the steps to install roof flashing correctly?
The method depends on the type, but the universal sequence is: (1) lay underlayment up the wall and across the deck, (2) size your flashing pieces 2 inches wider than the shingle exposure, (3) weave each piece into its shingle course so it covers the one below and tucks under the one above, (4) nail the horizontal flange to the roof deck only — never into the vertical wall, and (5) seal with asphalt plastic cement, not caulk.
How long does roof flashing last in NJ?
Properly installed step flashing and chimney flashing typically lasts the full lifespan of the roof — 25 to 30 years on an architectural shingle roof, longer on metal. Pipe boots have a shorter life because the rubber collar fails first; expect 10 to 15 years in NJ’s climate.
What’s the biggest flashing mistake to avoid?
Nailing the flashing to the vertical wall instead of just to the roof deck. This one mistake accounts for more flashing failures than everything else combined. Your roof and your wall move independently through NJ’s temperature cycles — tie them together with a nail and the flashing warps, buckles, and leaks within a few seasons.
Flashing is the smallest, cheapest, most overlooked part of your roof — and it causes more leaks than everything else combined. The two universal rules are simple to understand but hard to execute cleanly across every corner, dormer, chimney, and vent penetration on a sloped roof. That’s why we tell NJ homeowners the same thing every time: if the flashing is on a shed or an outbuilding, this guide gives you what you need. If it’s above living space, call before you climb.
Get a Flashing Inspection From Bergen County’s GAF Master Elite Contractor
If you have a leak, you’re planning a reroof, or you want a second opinion on whether your existing flashing is holding up, the smartest first move is getting a professional set of eyes on it.
Golden Hammer Roofing & Chimney is a GAF Master Elite, Owens Corning, CertainTeed, and TAMKO certified contractor based in Hasbrouck Heights, Bergen County NJ. We’ve been installing, repairing, and tearing off failed flashing across all 21 NJ counties for over 25 years, and we’re part of the less than 3% of roofing contractors in North America who hold GAF Master Elite certification.
Request a free estimate online, or call us directly. We’ll go over your flashing situation, flag what needs attention, and give you a straight answer on what your roof needs.
📞 Call +1 (201) 364-2084
🌐 Request a free estimate online

